Maintain your systems for best performance.

Containers_Stack

Preventive Maintenance for Maximum Efficiency

Every customer that implements a new bulk material handling system ultimately requires commissioning, startup support, and operator training. These services have long been a core part of our approach. We take pride in coordinating system startup and ensuring the equipment we design and manufacture is integrated, operational, and supported from day one.

Parts + Accessories Check Out Our Line of Unloaders and Components

Part_Identify

Need Help Identifying a Part?

Contact our support team for assistance!

Recommended Spare Parts Replacement Schedule

Part / Accessory Where Used Suggested Replacement Frequency Severity of Failure Consequences of Failure
Vacuum motors Used in self-contained vacuum loaders (aka Whisper Loaders). Motors should be replaced every 3-6 months or 1500 hours of use, whichever comes first. HIGH System down until replaced.
Cartridge filters Used in PR receivers and whisper loader receives Bag dump stations, bin vent filters. Cartridge filters should be replaced every 30-60 days. More aggressive material may be required to be changed more frequently. HIGH An overly used filter will wear down and lose filtration efficiency. This can cause product to leak into the motor causing the motor to fail prematurely.
"Flat" filters Used in VP receivers and Whisper Loaders. Flat filters should be replaced every 60-90 days. More aggressive material may be required to be changed more frequently. MEDIUM An overly used filter reduces air flow, which reduces overall capacity, and in systems with integrated vacuums, shortens the life of the system motor.
Self-contained loader retrofit kit Discontinuation of Motors with brushless motor for SC2000s and SC2500s (models pre-2019). Motors should be replaced every 3-6 months of use. HIGH System down until replaced.
Proximity switch All loaders and receivers with flapper discharge. Consider back ups to keep you from going down should one get broken or wet. HIGH System down until replaced.
Flex tubing and hoses All loaders and receivers. Every 9-12 months depending on operating environment. MEDIUM Old tubing will eventually crack, reducing throughput capacity.
Gaskets Used in receivers, self-contained loaders. Replace every 3-6 months. A cracked or worn gasket will reduce vacuum due to cracking. Keep several spares in stock and replace as necessary. MEDIUM Reduction in throughput capacity.
White Gaskets Used in receivers, self-contained loaders, portable feed bin hoppers with lids, bag dumps, access doors on receivers. Replace every 3-6 months. A cracked or worn gasket will reduce vacuum due to cracking. Keep a spare or two in stock and replace as necessary. MEDIUM Reduction in throughput capacity.
White Actuator Disk and assembly Vacuum control and vacuum breaker valves in central powered systems. Typically annually. Inspect quarterly for excess wear. Keep a spare in stock. HIGH System down until replaced.
Pulse valve and solenoid Receiver, Loaders, Bin-vents, Bag dump stations. Keep a spare or two in stock and replace as necessary. MEDIUM Not pulsing filters will cause build up in material on the filter area and loss of airflow affecting performance.
Non-VS Panel Relays All non-VS loaders. Consider back ups to keep you from going down. HIGH System down until replaced.